Rockport, ME – E-One eMax Rescue Pumper

Project Manager: Chris Champagne Delivery Date: July 1, 2018 E-One Typhoon cab and chassis with E-Max rescue pumper design. Extended front bumper with two CAFS equipped 200' pre-connects. Custom cab interior layout as a command post/rehab area. All LED warning/Scene light package including the tri-color roto ray. Large body storage compartments with all full depth design. The E-One designed pump layout provides for all this storage with a short 204" wheelbase Hosebed access ladder, internal storage for ladders/suction hoses. Roof top compartment storage. Enclosed ground level access to stokes basket, water rescue sled, long handle tools. 1500 GPM E-One pump…

Dexter, ME – Custom Pumper Refurbishment

Project Manager: Chris Champagne Delivery Date: December 21, 2017 Features: Frame refurbishment and rust prevention treatment New Cab Interior including seats, dash, doors, lights Full pump and plumbing rebuild with upgrade to stainless steel All new NFPA compliant LED warning light package Upgrade to LED lights for steps, ground, compartment, and DOT New LED scene lights Full paint and lettering package

Braintree, MA – E-One Custom Pumper

Project Manager: Mark MacDonald Delivery Date: December 8, 2017 Engine: Cummins L9 Transmission: Allison EVS 3000 Electronic Stability Control 68 MPH 65 Gallon Fuel System Poly 3 Water Tank Pump Hale QMax 1500 GPM Rating

Topsham, ME – E-One Custom Pumper

Project Manager: Chris Champagne Delivery Date: December 13, 2017 E-One Typhoon Severe Duty Chassis 450 Cummins Engine/Allison Transmission Galvanized Frame system Stainless fuel and air hoses Stainless Fuel Tank Hale 1500 GPM Pump Class 1 foam system 1000 gallon UPF water tank Body with Internal storage for ladders and suction hoses Custom tool mounting layout Whelen LED warning and scene lighting package Smart Power 6KW generator Hanney 200' cord reel Command Light tower  This is Topsham's 5th vehicle from Greenwood and we appreciate their support!

Swansea, MA – E-One Custom Pumper

Project Manager: Audra Jaconetti Delivery Date: December 3, 2017 Engine: Cummins L9 Transmission: Allison EVS 3000 65 Gallon Fuel System 68 MPH Cyclone II X Long Cab On-Spot Tire Chains Stainless Steel Pump Panel

Georgetown, ME – E-One Tanker Pumper

  Project Manager: Chris Champagne Delivery Date: November 3, 2017 Freightliner M2-106 Chassis with 350 HP Hale 1250 GPM Pump, 2000 gallon water tank Internal storage for ladders/suction hoses Electric fold down dump tank storage All LED warning, DOT, compartment, and Scene lighting

Milton, MA – E-One Custom Pumper

  Project Manager: John Buckley Delivery Date: October 30, 2017 Engine: Allison EVS 3000 Transmission: Cummins ISL Typhoon Chassis Electronic Stability Control 65 Gallon Fuel System 68 MPH Stainless Steel Pump Panel

Plymouth, MA – E-One Custom Pumper

Project Manager: Mark MacDonald Delivery Date: October 20, 2017 Engine: Cummins ISX 12 Transmission: Allison EVS 4000 Fuel System - 65 Gallon Cyclone II Medium Cab Stainless Steel Pump Panel Poly 3 Water Tank - 30 Gallon Foam Tank 1500 GPM Rating

Wolcott, CT – E-One Custom Pumper

Project Manager: Audra Jaconetti Delivery Date: October 5, 2017 Engine: Cummins ISX 12 Transmission: Allison EVS 4000 G4 Electronic Stability Control 68 MPH 65 Gallon Fuel System Cyclone II X Medium Cab EPA Cooling System