Southbridge, MA – E-One Metro 100 Ladder

Compartment Photos: Interior Photos: Project Manager: Dan Martins Delivery Date: September 28, 2021 FEATURES: E-One Typhoon chassis 3/16” Extruded Aluminum Cab 96” Wide Extruded Body 100’ Tough Truss LTH Aerial (Low Travel Height) 2.5:1 Aerial Safety Rating Advanced Aerial Control System Under slung Jacks with only an 11’ Full Jack…

Hartford Ladder 4 in Action

Hartford Ladder 4 putting in a little work earlier today on Collins St for reported smoke showing from the 2nd floor. Members were able to stick the roof despite the tight squeeze thanks to the amazing maneuverability and extremely narrow jack spread on the Metro100!

Wellesley, MA – E-One HP75 Quint

  Interior Photos: Compartment Photos: Project Manager: Mark MacDonald Delivery Date: August 31, 2021 FEATURES: Cummins L9 450hp motor Electronic stability control Disc brakes A heavy duty steel bumper Galvanized frame assembly, including the cross members Frame extensions and battery brackets for added corrosion protection Cab and chassis also features…

Manchester, NH – E-One HR 100 Quint Ladder

  Project Manager: John Buckley Delivery Date: December 23, 2020   FEATURES: Typhoon Cab with Split Aerial Vista Roof HR 100 Ladder with 500 lbs. Tip Load 500 Gallons of Water Waterous 1750 GPM Water Pump Harrison 8 kw Gen Set Advanced Aerial Control System

Barrington, RI – E-One HP 100′ Quint Aerial

    Project Manager: Brian Zarlenga Delivery Date: September 23, 2020   FEATURES: Engine Cummins X12-500 hp Transmission: Allison EVS4000 100’ HP Aerial sidestacker Chassis: Cyclone II Medium Cab Pump: Waterous CSU- 1500 GPM Water Tank: 500 Gallons Foam Tank: 25 Gallons Class A