greenwoodev, greenwood emergency vehicles Waltham, MA – E-One LTH100 Ladder

Waltham, MA – E-One LTH100 Ladder

 

Project Manager: Brian Zarlenga
Delivery Date: April 14, 2026

 

Features:

• E-ONE Typhoon chassis
• Cummins L9 450HP engine
• EVS 3000 transmission
• 100’ LTH (Low Travel Height) aluminum ladder
• Electronic Stability Control
• RollTek airbag system
• Driver-controlled differential
• 360 AMP Niehoff alternator
• Direct hydraulic aerial control system
• Whelen lighting package

Scroll to Top