Dedham, MA – E-One HR100 Ladder

 

Project Manager: Mark MacDonald
Delivery Date: November 30, 2026

FEATURES:
πŸ”Ή Front disc brakes and electronic stability control
πŸ”Ή Heavy-duty inner-city front and rear bumpers
πŸ”Ή Large rear-wall medical cabinet
πŸ”Ή Automatic chassis and aerial outrigger lubrication system
πŸ”Ή Zinc flame-spray-coated integral torque box and jack legs
πŸ”Ή Stainless steel air tank straps for added corrosion protection
πŸ”Ή Smart Power 10KW hydraulic generator and electric cord reel
πŸ”Ή Custom Whelen warning and scene lighting package
πŸ”Ή Backup camera system and Q2B siren
πŸ”Ή Custom equipment mounting package with tool boards, adjustable shelving, and rollout trays

Scroll to Top